Campaign Details
NVPC - Giving Week 2019
Dates
Registration
Start Date
Thu, 17 Oct 2019
End Date
Thu, 7 Nov 2019

Installation Period
Estimated installation time is 30 to 45 minutes for stickers and 5 to 10 mins for in-car hangers.
Start Date
Wed, 30 Oct 2019
End Date
Fri, 8 Nov 2019

Campaign
Start Date
Fri, 8 Nov 2019
End Date
Sat, 7 Dec 2019

Uninstallation Period
Estimated uninstallation time is 15 to 25 minutes for stickers and 5 to 10 mins for in-car hangers.
Start Date
Mon, 9 Dec 2019
End Date
Fri, 13 Dec 2019

Details
Incentives
Payout
S$100 Lump Sum

Payout Details

Payment will be made via your Grab wallet two weeks after the end of campaign end date.


Sticker Placements
    Car Stickers:
  • 4 doors wrap
  • Bumper
  • Bonnet
    In-car Items
  • In-car hanger
    Car Labels:
  • Grab label at both C-pillars (Total = 2pc)
  • Carblicity label at both windscreens (Total = 2pc)
Requirements
  • Reporting
  • Reporting of mileage and sticker integrity is required.
  • Your total mileage for this job must hit 1000 Km
  • Online Reporting Dates (Window Periods)
    • Report 1: 02/12/2019 to 06/12/2019
  • Location
  • This job is only available to drivers in Singapore
  • Vehicle
  • This job is only available to Car type vehicles only.
  • Drivers
  • This job is open to drivers with:
    • Grab
  • Others
  • Lion City Rentals (LCR) does not allow its hirers to participate in advertising-related campaigns. By signing up, you hereby confirm that your Grab-registered vehicle is not rented from LCR.

  • Access
  • Please login or signup to register for this job.